Structure Fire - 3/27/18 |
By J. Dumin | |
March 27, 2018 | |
At 01:41 am all 4 Berlin Fire Companies were dispatched to a reported structure fire at 54 Sun Meadow Dr. Car 11 arrived on scene confirming a home fully involved and the occupants evacuated. Crews stretched hand lines and began an exterior attack while Truck 9 attacked from the roof. The main body of fire was knocked down and the structure was overhauled checking for hot spots. Task Force 51 was activated for town coverage. Operating on Scene: Engines 2, 7, 8, 12 |
|